Parveen Mittar Nanda is Executive Vice President (Engineering & Projects) in Greenko Group. Presently working on Pumped Storage Projects & Decarbonization mission of Greenko Group. He is Civil Engineer Graduate from MNNIT Allahabad with Post Graduation from NIT Kurukshetra India.
Has experience of more than 39 years in specialised hydro power which includes more than 10 years in Integrated Renewable Energy Storage projects including Pumped storage projects.
Also has discrete distinction of equally working in Government and Private sector, i.e., for more than 19 years each.
Started career with Irrigation Deptt in Himachal Pradesh in 1987 switched to HPSEB (now HPPCL) in 1989 and now working in Private sector with Greenko since 2012.
Has done extensive work on Off stream Closed Pumped storage projects and was instrumental in identifying 20 Mega PSPs worth 120 GWH of Energy storage capacity for Greenko Group which are planned to be commissioned by 2032.
Introduced the concept of Modular Pumped storage projects & Use of Two Sizes machines (for increased flexibility with fixed speed machine) where in first set two projects with this concept are now ready for commissioning by year end i.e. Pinnapuram 1680 MW (already commissioned) & MP 1920 MW.
Identified & conceptualised two World’s Largest Integrated Renewable Energy Projects with Storage (IRESP) of 5.23 GW & 5.5 GW in Andhra Pradesh & Karnataka where in Worlds First IRESP at Pinnapuram was commissioned recently with the Pumped storage component of 1.68 GW.
By commissioning India’s Largest PSP Pinnapuram 1680 MW in 42 months and at a cost <6Cr MW, showcased to industry that optimization of time and Cost is a reality with improvisation of layouts and Designs in Off stream PSPs.
On PSP front second PSP of 1920 MW is ready for commissioning by end of 2026 & working on balance PSPs of around 17 GW for commissioning by 2032.
He has worked on around 20 hydro projects (other than PSPs) spread across 15 states In India till date which include prestigious projects like Nathpa Jhakri 1500 MW, Teesta III 1200 MW, Larji 126 MW, Demwe Lower 1750 MW, Sorang 100 MW, Dikchu 110 MW, and many other small hydro projects of <25 MW capacity.
Well versed with Statutory requirements & policy framework of energy sector as was associated with number of projects from concept to commissioning.
Hands on experience in dealing with social & environmental aspects & Critical issues associated with planning & implementation of Hydro & Pumped storage projects.